Get AD​ Free

Looting ads... 💰

Greywater

Inspection Record

Author
Bruno Jackson, Head of the Union Power Station
Location
Greywater Union Power, Northwest Iron River
Date
February 14, ██32
Date: February 14, 2047. Inspector: Bruno Jackson 1. No. 3 fan blades are making loud noises. Preliminary judgment is that something has fallen off, and further inspection is required 2. Blue rust-like attachments appeared at the joints of multiple parts at the lower end of the No. 1 wind turbine tower. Preliminary judgment is that this is Stardust corrosion and needs to be dealt with as soon as possible. 3. The No. 2 fan generator overheated and stopped working. Will try to restart it after shutting it down and letting it cool for 24 hours.